Skip to content
Bathroom stripped back for renovation

Home / Walls & bathrooms

Licensed asbestos removal for walls and wet areas

Asbestos Walls and Bathrooms Removal Gold Coast

Asbestos removal from walls and bathrooms on the Gold Coast usually comes up when a renovation starts, because the tiles come off and there is grey fibro (old asbestos cement sheeting) behind them.

Before the tiles come off, check what is behind them

Bathrooms, laundries and kitchens built before 1990 often used bonded (solid, not crumbly) cement sheeting behind tiles because it handled water well. Internal walls and ceilings in older homes may use it too. Some vinyl floors have a backing that can be friable (crumbly, can turn to dust), which needs more care.

Inside a house, keeping dust out of other rooms matters. A written scope should cover the work area, clean-up, waste and when the room can be used again. Ask whether a clearance certificate (written sign-off after removal) is included before your builder returns.

Test before you demolish. A tiler or builder who hits asbestos mid job has to stop, which costs more time than testing first.

Exposed bathroom wall during renovation
Local detail

What 10 square metres actually looks like

Ten square metres sounds big, but it is roughly four standard sheets, about one wall of an average bathroom. Many bathroom jobs go past it once you count the walls, ceiling and the floor sheet under the tiles.

That matters because 10 square metres is where Queensland rules change for who can do the work. Measure all the sheeting in the room, not just the wall you are worried about.

FAQs

Common questions

Is there asbestos behind my bathroom tiles?

If the bathroom is original to a pre 1990 home, there may be. Wet areas often used fibro (old asbestos cement sheeting) as the base for tiles. A lab test of a small sample, taken safely, gives you the answer before you start pulling tiles off.

Can I keep living in the house during removal?

Usually yes, as long as the work area is sealed off and you stay out of it until the clearance certificate (written sign-off after removal) is issued. Families with small children sometimes choose to be out for the day.

Do I need to remove the tiles first?

No. Leave the tiles on. Chipping tiles off breaks the sheeting underneath. They come off together as one piece.

Ask for a quote

Tell us where the sheeting is and roughly how much there is. Plain descriptions are fine, there is no need to know the right words.

Please do not break off, cut or collect a piece to check it. Leave it where it is.

Prefer to read first? See the price guide.

A guess is fine.

Licensed asbestos removal, Gold Coast

Ask for a quote