
Home / Eaves
Licensed asbestos eaves removalAsbestos Eaves Removal Gold Coast
Asbestos eaves removal on the Gold Coast covers the flat sheets under eaves (underside of the roof overhang), which in many older homes are fibro (old asbestos cement sheeting) with a strip of timber holding them in place.
Taking down eave sheets without breaking them overhead
Eave sheets are bonded (solid, not crumbly), but they sit overhead, so anything that breaks falls toward you. They also hide decades of dust, possum mess and wasp nests. That is why eaves are wetted, the timber battens are unscrewed gently, and each sheet is lowered onto plastic.
Eaves often come up during a repaint or when sheets start sagging after a leak. If only one or two sheets are damaged, it can still make sense to replace the whole side so new sheets match.

The 10 square metre homeowner rule
In Queensland, a homeowner can remove up to 10 square metres of bonded asbestos at their own home without a certificate. Over 10 square metres, a homeowner needs a Queensland homeowner certificate, and that covers the whole job. You cannot split a bigger job into small pieces to stay under the limit.
Eaves add up quickly. A modest house can have well over 10 square metres right around. Measure first, and if you are unsure, licensed asbestos removal takes the guesswork out of it.
Common questions
Can I remove a small bit of asbestos myself?
In Queensland a homeowner can remove up to 10 square metres of bonded (solid, not crumbly) asbestos at their own home. You still need to wet it, wear the right mask and coveralls, avoid power tools, wrap it properly and take it to a tip that accepts asbestos. Read the Queensland Government homeowner guidance before you start.
Do I need a certificate for more than 10 square metres?
Yes. Above 10 square metres, a homeowner needs a Queensland homeowner certificate. Otherwise it needs licensed removal.
Does the 10 square metres apply to the whole job?
Yes. The limit applies to the whole job, not each day or each wall. Doing the eaves one side at a time to stay under the limit is not allowed.
Can I do a bit each weekend?
No, not to get around the size limit. Count the whole planned job, even when it runs over several weekends. Breaking a larger job into stages does not change the certificate requirement.
Ask for a quote
Tell us where the sheeting is and roughly how much there is. Plain descriptions are fine, there is no need to know the right words.
Please do not break off, cut or collect a piece to check it. Leave it where it is.
Prefer to read first? See the price guide.